Photos from: Petersburg Library Project continues on schedule




Shelly Pope

Heat tubing has been installed throughout the library facility for the floor heating. This heating process will continue outside the building to the sidewalks and driveway as well.



Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024