Photos from: Harbor Way dug up to install vault




Kyle Clayton / Petersburg Pilot

Crews have installed a water vault to tie in to an existing borough water line in preparation for utility connection for the new North Harbor. The walk down ramp will also be located near the site.



Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024