Petersburg Pilot -

Harbor Way dug up to install vault


Kyle Clayton / Petersburg Pilot

Crews have installed a water vault to tie in to an existing borough water line in preparation for utility connection for the new North Harbor. The walk down ramp will also be located near the site.

For access to this article please sign in or subscribe.


Reader Comments


Our Family of Publications Includes:

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2017

Rendered 03/17/2018 01:50