Home About Contact Advertise
Subscribe Sign In
October 24, 2013
Kyle Clayton / Petersburg Pilot
Crews have installed a water vault to tie in to an existing borough water line in preparation for utility connection for the new North Harbor. The walk down ramp will also be located near the site.
For access to this article please sign in or subscribe.
Reader Comments(0)