October 24, 2013 | Vol. 39, No. 43

Harbor Way dug up to install vault

For access to this article please sign in or subscribe.

Kyle Clayton / Petersburg Pilot
Crews have installed a water vault to tie in to an existing borough water line in preparation for utility connection for the new North Harbor. The walk down ramp will also be located near the site.

Reader Comments

(0)