Home About Contact Advertise
Subscribe Sign In
Mary Koppes / Petersburg Pilot
The transfer bridge for the new drive down dock was installed Friday by a large barge-based crane. All but two float sections for the project have arrived and are being bolted together at Tamico's facility in Scow Bay, according to Borough Manager Steve Giesbrecht.