AboutContactAdvertise
SubscribeSign In
Pilot Photo
The 180x65-foot float component of the drive down dock was towed down the Wrangell Narrows to the project's worksite yesterday. Tamico staff recently completed the assembly and preparation of the float-which arrived in 13 pieces-at their Scow Bay facility.