Transfer bridge installed

 

Mary Koppes / Petersburg Pilot

The transfer bridge for the new drive down dock was installed Friday by a large barge-based crane. All but two float sections for the project have arrived and are being bolted together at Tamico's facility in Scow Bay, according to Borough Manager Steve Giesbrecht.



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024