Inspection results: Mold present in Petro building

 

November 7, 2019

Results from a mold sample test from the Petro 49, Inc. building that the borough would receive in a possible land swap were presented to the borough assembly Monday that showed three types of mold present in the building.

The testing of the mold samples was conducted by Advance Look Building Inspections & Environmental Testing, which is based out of Wasilla. In the warehouse, the results showed one type of mold in the wall insulation. The testing also determined the air quality in the warehouse to be at healthy levels.

Samples from the office area of the building revealed two types of...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024